The biggest challenge is planning for the proper infrastructure allowing us to have the proper connectivity when the time comes, because as you know, trying to plan 10 years ahead of time when we know that in our technology lifespan we live on a three-year basis means that we just can't plan 15 years ahead of time.
The goal, as Mr. Wright and Mrs. Garrett said, is to have technology team members integrated into the construction team. Our goal right now is to work closely with them to have the proper infrastructure everywhere in the facility, so that we can then talk about the systems and the solutions once we are in the design stage of the building, in order to provide the services.
That is another area on which we need consultation with members. As you know, if we're moving toward a chair layout in the chamber versus a desk layout, that certainly will change how we interact with you from a technology perspective in the chamber. It might be the case that we won't be able to supply you with a Surface tablet or a laptop. We'll need to find different ways to interact. It will be the same thing with voting.
There are different things that we're going to be looking at over the next year, but our focus right now is really on the technology infrastructure and making sure that it is everywhere in the facility so that we can have the proper security, proper connectivity and proper environmental control systems that you will require in this new facility, sir.